SH 44 ML WBND over I 76 ML
104TH AVE WB OVER I76 · County 001, Colorado · Built 1996 · 2 Lanes · 9,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.885181, -104.869244
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 30 years old.
Nearby Bridges
EB SH 44_104TH AVE over I76 ML
Built 2015
HAVANA STREET over OBRIAN CANAL
Built 1984
SH 44 EB over OBRIAN CANAL
Built 2013
SH 44 WB over OBRIAN CANAL
Built 2013
BELLE CREEK BLVD over BELLE CREEK
Built 2003
I 76 ML WBND over UP RR
Built 2014
I 76 ML EBND over UP RR
Built 2016
I 76 ML WBND over US 85 ML NBND
Built 1990
96TH AVENUE over OBRIAN CANAL
Built 1994
112TH AVENUE over FULTON DITCH
Built 2021
Bridge Details
- Structure #
- E-17-VR
- Year Built
- 1996
- Length
- 105.2 m (345.1 ft)
- Max Span
- 51.8 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,085,000
- Total Project Cost
- $1,194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.