SH 44 ML WBND over I 76 ML

104TH AVE WB OVER I76 · County 001, Colorado · Built 1996 · 2 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-VR
Year Built
1996
Length
105.2 m (345.1 ft)
Max Span
51.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,085,000
Total Project Cost
$1,194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.