SH 44 ML over FULTON DITCH
0.7 MI W OF JCT US 85 · County 001, Colorado · Built 1959 · 2 Lanes · 14,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.885253, -104.895761
This bridge is in worse condition than 79.4% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 67 years old.
Nearby Bridges
SH44 ML(104TH AVE) over SOUTH PLATTE RIVER
Built 2013
I 76 ML WBND over US 85 ML NBND
Built 1990
I 76 ML EBND over UP RR
Built 2016
I 76 ML WBND over UP RR
Built 2014
BELLE CREEK BLVD over BELLE CREEK
Built 2003
I 76 ML over 96TH AVE
Built 1976
MCKAY ROAD over SOUTH PLATTE RIVER
Built 1965
MCKAY ROAD over GRANGE HALL CREEK
Built 2005
BRIGHTON ROAD over FULTON DITCH
Built 2022
112TH AVENUE over FULTON DITCH
Built 2021
Bridge Details
- Structure #
- E-17-CC
- Year Built
- 1959
- Length
- 18.7 m (61.4 ft)
- Max Span
- 17.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 14,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $287,000
- Total Project Cost
- $315,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.