HAVANA STREET over SAND CREEK
0.3 MI S OF SMITH ROAD · County 031, Colorado · Built 1989 · 2 Lanes · 13,787 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
39.763575, -104.865828
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 37 years old.
Nearby Bridges
WB MARTIN LUTHER K over WESTERLY CREEK | PEDESTR
Built 2005
EB MARTIN LUTHER K over WESTERLY CREEK | PEDESTR
Built 2005
I 70 ML over HAVANA ST UP RR
Built 2016
I 70 ML over FUTURE UP RR
Built 2017
26TH AVENUE over WESTERLY CREEK
Built 2005
PEORIA STREET over UPPR SMITH RD 37TH AVE
Built 2014
PEORIA STREET over BARANMOR DITCH
Built 2014
PEORIA STREET over SAND CREEK
Built 1966
QUENTIN ST over LOCAL DRAINAGE
Built 2016
SMITH ROAD over SAND CREEK
Built 1955
Bridge Details
- Structure #
- D-19-SC-050A
- Year Built
- 1989
- Length
- 91.6 m (300.5 ft)
- Max Span
- 25.6 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 13,787
- Material
- Prestressed Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.