I 70 ML over FUTURE UP RR

.04 MI W of HAVANA · County 031, Colorado · Built 2017 · 12 Lanes · 205,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
E-17-VE
Year Built
2017
Length
13.4 m (44 ft)
Max Span
12.2 m
Width
66.2 m (217.2 ft)
Lanes
12
Daily Traffic
205,000
Material
Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.