I 70 ML over FUTURE UP RR
.04 MI W of HAVANA · County 031, Colorado · Built 2017 · 12 Lanes · 205,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
39.776108, -104.866831
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 9 years old.
Nearby Bridges
I 70 ML over HAVANA ST UP RR
Built 2016
E 47TH AVENUE over MONTBELLO DITCH
Built 1999
E 48TH AVENUE over MONTBELLO DITCH
Built 2001
E 49TH AVENUE over MONTBELLO DITCH
Built 2001
CENTRAL PARK BLVD over I270 ON RAMP | EB/WB I7
Built 2012
HAVANA STREET over SAND CREEK
Built 1989
51ST AVENUE over MONTBELLO DITCH
Built 1995
I 70 ML WBND over PEORIA STREET
Built 2020
I 70 ML EBND over PEORIA STREET
Built 2020
CNTPRK RMPTOWB I70 over I70 WB RMP TO I270
Built 2012
Bridge Details
- Structure #
- E-17-VE
- Year Built
- 2017
- Length
- 13.4 m (44 ft)
- Max Span
- 12.2 m
- Width
- 66.2 m (217.2 ft)
- Lanes
- 12
- Daily Traffic
- 205,000
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.