QUENTIN ST over LOCAL DRAINAGE
JUST N OF BARANMOOR PKWY · County 001, Colorado · Built 2016 · 2 Lanes · 332 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.762628, -104.844503
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 10 years old.
Nearby Bridges
PEORIA STREET over BARANMOR DITCH
Built 2014
PEORIA STREET over UPPR SMITH RD 37TH AVE
Built 2014
PEORIA STREET over SAND CREEK
Built 1966
SMITH ROAD over LOCAL DRAINAGE
Built 2014
I 70 ML EBND over PEORIA STREET
Built 2020
I 70 ML WBND over PEORIA STREET
Built 2020
I 225 ML over SMITH RD UP RR
Built 1994
I 225 ML over 28TH & 30TH AVE SAND
Built 1990
I 225 NB RAMP over I 70 ML
Built 1997
HAVANA STREET over SAND CREEK
Built 1989
Bridge Details
- Structure #
- AUR01.9-E.3-A
- Year Built
- 2016
- Length
- 12.7 m (41.7 ft)
- Max Span
- 6.1 m
- Width
- 16.4 m (53.8 ft)
- Lanes
- 2
- Daily Traffic
- 332
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.