PEORIA STREET over BARANMOR DITCH

PEORIA and BARANMOR PKWY · County 001, Colorado · Built 2014 · 8 Lanes · 25,984 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
AUR01.9-E.0
Year Built
2014
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Width
113.2 m (371.4 ft)
Lanes
8
Daily Traffic
25,984
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.