SH14ML/FRONTAGE RD over CACHE LA POUDRE DITCH 2
1.8 MI E OF JCT US 287 · County 069, Colorado · Built 1967 · 8 Lanes · 33,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.580792, -105.043378
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 59 years old.
Nearby Bridges
Lincoln Avenue over Dry Creek
Built 1948
SH 14 ML over CACHE LA POUDRE DITCH 2
Built 1967
SH 14 ML over DRY CREEK
Built 1999
Timberline Road over Cache La Poudre River
Built 1998
County Rd. 46E over Dry Creek Outfall Channe
Built 1998
LeMay Avenue over Cache La Poudre River
Built 1980
SH 14 ML over CACHE LA POUDRE RIVER
Built 2015
Prospect Road over Spring Creek
Built 1987
Timberline Road over Spring Creek
Built 1986
East Vine Drive over Lake Canal
Built 1950
Bridge Details
- Structure #
- B-16-AR
- Year Built
- 1967
- Length
- 9.1 m (29.9 ft)
- Max Span
- 9.1 m
- Width
- 58.5 m (191.9 ft)
- Lanes
- 8
- Daily Traffic
- 33,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.