Prospect Road over Spring Creek
0.2 Mi E of Timberline Rd · County 069, Colorado · Built 1987 · 5 Lanes · 24,628 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
40.567433, -105.0368
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 39 years old.
Nearby Bridges
Timberline Road over Spring Creek
Built 1986
Riverside Drive over Spring Creek
Built 2019
Prospect Road over Cache La Poudre River
Built 1986
Timberline Road over Cache La Poudre River
Built 1998
Prospect Road over Cache La Poudre Overflow
Built 2006
Welch Street over Spring Creek
Built 1999
SH 14 ML over DRY CREEK
Built 1999
SH 14 ML over CACHE LA POUDRE DITCH 2
Built 1967
Lincoln Avenue over Dry Creek
Built 1948
SH14ML/FRONTAGE RD over CACHE LA POUDRE DITCH 2
Built 1967
Bridge Details
- Structure #
- FCPRST-0.2-TMBL
- Year Built
- 1987
- Length
- 32.5 m (106.6 ft)
- Max Span
- 11.9 m
- Width
- 26.6 m (87.3 ft)
- Lanes
- 5
- Daily Traffic
- 24,628
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.