Timberline Road over Spring Creek
100 Ft S of Prospect Rd. · County 069, Colorado · Built 1986 · 7 Lanes · 36,342 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
40.566594, -105.03915
This bridge is in worse condition than 61.7% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
Prospect Road over Spring Creek
Built 1987
Riverside Drive over Spring Creek
Built 2019
Prospect Road over Cache La Poudre River
Built 1986
Welch Street over Spring Creek
Built 1999
Timberline Road over Cache La Poudre River
Built 1998
SH 14 ML over CACHE LA POUDRE DITCH 2
Built 1967
SH 14 ML over DRY CREEK
Built 1999
Prospect Road over Cache La Poudre Overflow
Built 2006
LeMay Avenue over Spring Creek
Built 1975
SH14ML/FRONTAGE RD over CACHE LA POUDRE DITCH 2
Built 1967
Bridge Details
- Structure #
- FCTMB-0.1-PRST
- Year Built
- 1986
- Reconstructed
- 2006
- Length
- 26.9 m (88.3 ft)
- Max Span
- 13 m
- Width
- 34.7 m (113.8 ft)
- Lanes
- 7
- Daily Traffic
- 36,342
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.