SH 14 ML over CACHE LA POUDRE RIVER

1 MI E OF JCT 287 · County 069, Colorado · Built 2015 · 5 Lanes · 26,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B-16-EV
Year Built
2015
Length
116.1 m (380.9 ft)
Max Span
25.6 m
Width
37.8 m (124 ft)
Lanes
5
Daily Traffic
26,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.