N Lemay Ave & BNSF over E Vine Drive
2.77 MI west of JCT-I25 · County 069, Colorado · Built 2023 · 4 Lanes · 12,491 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
40.595842, -105.054242
This bridge is in worse condition than 29.9% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
East Vine Drive over Dry Creek
Built 2006
E Suniga Road over Lake Canal
Built 2023
Redwood Street over Lake Canal
Built 2004
East Vine Drive over Lake Canal
Built 1950
Linden Street over Cache La Poudre River
Built 1984
Lincoln Avenue over Cache La Poudre River
Built 2017
Jerome Street over Lake Canal
Built 2004
SH 14 ML over CACHE LA POUDRE RIVER
Built 2015
LeMay Avenue over Cache La Poudre River
Built 1980
US 287 ML over LAKE CANAL
Built 1930
Bridge Details
- Structure #
- FCLMY-0.0-VINE
- Year Built
- 2023
- Length
- 42.3 m (138.8 ft)
- Max Span
- 40.8 m
- Width
- 25 m (82 ft)
- Lanes
- 4
- Daily Traffic
- 12,491
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.