NORRISH ROAD over EAST HIGHLINE CANAL
1.3 MI E/O HIGHLINE RD · County 025, California · Built 1998 · 2 Lanes · 212 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
32.832714, -115.287308
This bridge is in worse condition than 64.3% of bridges in County 025. The average bridge in California is 0 years old; this one is 28 years old.
Nearby Bridges
NELSON PIT RD over EAST HIGHLINE CANAL
Built 1950
STATE ROUTE 115 over INTERSTATE 8
Built 1971
MILLER ROAD over INTERSTATE 8
Built 1971
EVAN HEWES HIGHWAY over EAST HIGHLINE CANAL
Built 1949
INTERSTATE 8 WB over HOLDRIDGE EAST HIGHLINE
Built 1971
INTERSTATE 8 EB over HOLDRIDGE EAST HIGHLINE
Built 1971
BOYD ROAD over EAST HIGHLINE CANAL
Built 1975
BONDS CORNER ROAD over INTERSTATE 8
Built 1971
INTERSTATE 8 over ALAMO RIVER
Built 1971
ORCHARD RD over ALAMO RIVER
Built 1968
Bridge Details
- Structure #
- 58C0220
- Year Built
- 1998
- Length
- 42 m (137.8 ft)
- Max Span
- 10.4 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 212
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.