NELSON PIT RD over EAST HIGHLINE CANAL
1.2 MI E/O MILLER RD · County 025, California · Built 1950 · 1 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
32.803289, -115.279439
This bridge is in worse condition than 64.3% of bridges in County 025. The average bridge in California is 0 years old; this one is 76 years old.
Nearby Bridges
NORRISH ROAD over EAST HIGHLINE CANAL
Built 1998
STATE ROUTE 115 over INTERSTATE 8
Built 1971
MILLER ROAD over INTERSTATE 8
Built 1971
EVAN HEWES HIGHWAY over EAST HIGHLINE CANAL
Built 1949
INTERSTATE 8 WB over HOLDRIDGE EAST HIGHLINE
Built 1971
INTERSTATE 8 EB over HOLDRIDGE EAST HIGHLINE
Built 1971
BONDS CORNER ROAD over INTERSTATE 8
Built 1971
INTERSTATE 8 over ALAMO RIVER
Built 1971
HUNT ROAD over ALAMO RIVER
Built 1971
TOWLAND ROAD over INTERSTATE 8
Built 1971
Bridge Details
- Structure #
- 58C0121
- Year Built
- 1950
- Length
- 36.6 m (120.1 ft)
- Max Span
- 4.9 m
- Width
- 5.6 m (18.4 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.