STATE ROUTE 115 over INTERSTATE 8
11-IMP-115-R3.30 · County 025, California · Built 1971 · 2 Lanes · 1,450 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.773167, -115.285606
This bridge is in worse condition than 15.5% of bridges in County 025. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
EVAN HEWES HIGHWAY over EAST HIGHLINE CANAL
Built 1949
INTERSTATE 8 WB over HOLDRIDGE EAST HIGHLINE
Built 1971
INTERSTATE 8 EB over HOLDRIDGE EAST HIGHLINE
Built 1971
MILLER ROAD over INTERSTATE 8
Built 1971
NELSON PIT RD over EAST HIGHLINE CANAL
Built 1950
BONDS CORNER ROAD over INTERSTATE 8
Built 1971
VERDE SCHOOL RD over EAST HIGHLINE CANAL
Built 1940
INTERSTATE 8 over ALAMO RIVER
Built 1971
HUNT ROAD over ALAMO RIVER
Built 1971
NORRISH ROAD over EAST HIGHLINE CANAL
Built 1998
Bridge Details
- Structure #
- 58 0222
- Year Built
- 1971
- Length
- 68.9 m (226 ft)
- Max Span
- 35.2 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,450
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.