BOYD ROAD over EAST HIGHLINE CANAL
1.1 MI E/O HIGHLINE RD · County 025, California · Built 1975 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
32.902133, -115.292897
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
BOYD ROAD over HOLTVILLE MAIN DRAIN
Built 1998
NORRISH ROAD over EAST HIGHLINE CANAL
Built 1998
STATE ROUTE 78 over EAST HIGHLINE CANAL
Built 1963
STATE ROUTE 115 over HOLTVILLE MAIN DRAIN
Built 1953
NELSON PIT RD over EAST HIGHLINE CANAL
Built 1950
SHANK ROAD over EAST HIGHLINE CANAL
Built 1938
STATE ROUTE 78 over COACHELLA CANAL (SIPHON)
Built 1983
ORCHARD RD over ALAMO RIVER
Built 1968
STATE ROUTE 115 over ALAMO RIVER
Built 1955
ZENOS RD over ALAMO RIVER
Built 1965
Bridge Details
- Structure #
- 58C0134
- Year Built
- 1975
- Length
- 32.6 m (107 ft)
- Max Span
- 7.9 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $315,000
- Total Project Cost
- $529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.