BOYD ROAD over HOLTVILLE MAIN DRAIN

0.9 MI E/O HOLT RD · County 025, California · Built 1998 · 2 Lanes · 86 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
58C0221
Year Built
1998
Length
37.1 m (121.7 ft)
Max Span
9.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
86
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.