MAST BLVD over SANTEE LAKE #2
1MI E/O WEST HILLS PKWY · County 073, California · Built 1992 · 4 Lanes · 10,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.849622, -117.007417
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 34 years old.
Nearby Bridges
CARLTON OAKS DR over SYCAMORE CREEK
Built 1960
CARLTON HILL BLVD over SAN DIEGO RIVER
Built 1978
STATE ROUTE 52 WB over MISSION GORGE ROAD
Built 2011
W52-S125 CONNECTOR over STATE ROUTE 125
Built 2011
STATE ROUTE 52 EB over MISSION GORGE ROAD
Built 2011
STATE ROUTE 52 WB over STATE ROUTE 125
Built 2011
N125-W52 CONNECTOR over SR 125 MISSION GORGE RD
Built 1998
E52-S125 CONNECTOR over MISSION GORGE RD
Built 1998
STATE ROUTE 52 EB over STATE ROUTE 125
Built 2011
STATE ROUTE 52 over FANITA CREEK
Built 2011
Bridge Details
- Structure #
- 57C0728
- Year Built
- 1992
- Length
- 258 m (846.5 ft)
- Max Span
- 43 m
- Width
- 29.9 m (98.1 ft)
- Lanes
- 4
- Daily Traffic
- 10,100
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.