MISSION VILLAGE RD over FRIARS RD
0.35MI W/O RTE I-15 · County 073, California · Built 1968 · 4 Lanes · 13,055 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.786767, -117.120214
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
FRIARS RD over MURPHY CANYON RD
Built 1967
SAN DIEGO MISSION over ROUTE 15 MURPHY CREEK
Built 1967
SB-15 ONRAMP over MURPHY CREEK
Built 1967
FRIARS ROAD over ROUTE15
Built 1967
SB-15 OFFRAMP over MURPHY CREEK
Built 1967
S-15 ONRAMP over MURPHY CREEK
Built 1967
RANCHO MISSION RD over MURPHY CANYON CREEK
Built 1998
INTERSTATE 15 over SAN DIEGO RIVER
Built 1960
S15-E/W8 CONNECTOR over I-15 & I-8
Built 1984
S15-CAMINO DEL RIO over I 8 & CONNECTOR RMPS
Built 1986
Bridge Details
- Structure #
- 57C0295
- Year Built
- 1968
- Length
- 49.4 m (162.1 ft)
- Max Span
- 31.1 m
- Width
- 28.6 m (93.8 ft)
- Lanes
- 4
- Daily Traffic
- 13,055
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.