RANCHO MISSION RD over MURPHY CANYON CREEK
0.2MI W/O WARD RD · County 073, California · Built 1998 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
32.781742, -117.114458
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 28 years old.
Nearby Bridges
INTERSTATE 15 over SAN DIEGO RIVER
Built 1960
S15-E/W8 CONNECTOR over I-15 & I-8
Built 1984
S15-CAMINO DEL RIO over I 8 & CONNECTOR RMPS
Built 1986
W8-N15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 1984
INTERSTATE 15 SB over ROUTE 8
Built 1960
WARD ROAD over SAN DIEGO RIVER
Built 1985
INTERSTATE 15 NB over ROUTE 8
Built 1960
N15-W8 CONNECTOR over I-15 I-8 RAMP & LOCAL
Built 1986
W8-S15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 2005
SAN DIEGO MISSION over ROUTE 15 MURPHY CREEK
Built 1967
Bridge Details
- Structure #
- 57C0723
- Year Built
- 1998
- Length
- 35.6 m (116.8 ft)
- Max Span
- 17.9 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.