S15-E/W8 CONNECTOR over I-15 & I-8
11-SD-015-R6.06-SD · County 073, California · Built 1984 · 3 Lanes · 48,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.779775, -117.113397
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 42 years old.
Nearby Bridges
S15-CAMINO DEL RIO over I 8 & CONNECTOR RMPS
Built 1986
W8-N15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 1984
INTERSTATE 15 SB over ROUTE 8
Built 1960
INTERSTATE 15 NB over ROUTE 8
Built 1960
N15-W8 CONNECTOR over I-15 I-8 RAMP & LOCAL
Built 1986
INTERSTATE 15 over SAN DIEGO RIVER
Built 1960
RANCHO MISSION RD over MURPHY CANYON CREEK
Built 1998
W8-S15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 2005
WARD ROAD over SAN DIEGO RIVER
Built 1985
INTERSTATE 15 over CAMINO DEL RIO SOUTH
Built 1986
Bridge Details
- Structure #
- 57 0884F
- Year Built
- 1984
- Length
- 949 m (3113.5 ft)
- Max Span
- 63.1 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 3
- Daily Traffic
- 48,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.