FRIARS ROAD over ROUTE15

11-SD-015-R6.82-SD · County 073, California · Built 1967 · 8 Lanes · 36,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57 0626
Year Built
1967
Length
138.4 m (454.1 ft)
Max Span
41.8 m
Width
30.6 m (100.4 ft)
Lanes
8
Daily Traffic
36,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.