BONITA ROAD over RICE CANYON
11-SD-000--CHV · County 073, California · Built 1973 · 7 Lanes · 30,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.648022, -117.059433
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 53 years old.
Nearby Bridges
INTERSTATE 805 over BONITA ROAD
Built 1975
PLAZA BONITA RD over SWEETWATER RIVER
Built 1981
H STREET over I 805 ON & OFF-RAMP
Built 1975
SWEETWATER RD over SWEETWATER RD STORM DRAN
Built 1985
N805-E54 CONNECTOR over SWEETWATER RIVER
Built 1975
INTERSTATE 805 SB over SWEETWATER RIVER
Built 1975
E54-S805 CONNECTOR over SWEETWATER RIVER
Built 1975
E54-N805 CONNECTOR over RTES 805 & 54 SWEETWATER
Built 1974
SWEETWATER RD over ROUTE 54
Built 1974
W54-S805 CONNECTOR over RTES 805 & 54 CONS RIVER
Built 1975
Bridge Details
- Structure #
- 57 1053
- Year Built
- 1973
- Reconstructed
- 1995
- Length
- 22 m (72.2 ft)
- Max Span
- 1.8 m
- Width
- 32 m (105 ft)
- Lanes
- 7
- Daily Traffic
- 30,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.