H STREET over I 805 ON & OFF-RAMP

11-SD-805-7.16-CHV · County 073, California · Built 1975 · 6 Lanes · 54,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0862
Year Built
1975
Length
102.7 m (336.9 ft)
Max Span
53.9 m
Width
30.8 m (101 ft)
Lanes
6
Daily Traffic
54,200
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.