INTERSTATE 805 SB over SWEETWATER RIVER

11-SD-805-8.66 · County 073, California · Built 1975 · 11 Lanes · 243,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0638
Year Built
1975
Reconstructed
2021
Length
162.8 m (534.1 ft)
Max Span
32.3 m
Width
71.5 m (234.6 ft)
Lanes
11
Daily Traffic
243,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.