W54-S805 CONNECTOR over RTES 805 & 54 CONS RIVER

11-SD-054-1.93-CHV · County 073, California · Built 1975 · 2 Lanes · 7,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0747F
Year Built
1975
Length
382.8 m (1255.9 ft)
Max Span
59.4 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,200
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.