PECHANGA PARKWAY over TEMECULA CREEK

0.2 MI. SE/O ROUTE 79 HWY · County 065, California · Built 2000 · 6 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56C0476
Year Built
2000
Length
88.4 m (290 ft)
Max Span
43.8 m
Width
29.9 m (98.1 ft)
Lanes
6
Daily Traffic
29,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.