I-15/SR-79 SB OFF over TEMECULA PARKWAY

08-RIV-015-3.42-TMCA · County 065, California · Built 2018 · 2 Lanes · 10,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0653K
Year Built
2018
Length
53.9 m (176.8 ft)
Max Span
53.9 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
10,150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.