INTERSTATE 15 NB over TEMECULA PARKWAY

08-RIV-015-3.42-TMCA · County 065, California · Built 1976 · 4 Lanes · 134,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0653R
Year Built
1976
Length
52.6 m (172.6 ft)
Max Span
52.6 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
134,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.