LOMA LINDA ROAD over PECHANGA PARKWAY CHANNEL

0.8 MI S RTE 79 · County 065, California · Built 2008 · 4 Lanes · 400 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
56C0557
Year Built
2008
Length
13.9 m (45.6 ft)
Max Span
4.3 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
400
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.