GENE AUTRY TRAIL over HIGHWAY 111 CHANNEL

50 S/O PALM CANYON DRIVE · County 065, California · Built 1982 · 5 Lanes · 1,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
56C0312
Year Built
1982
Length
9.8 m (32.2 ft)
Max Span
3 m
Width
26.7 m (87.6 ft)
Lanes
5
Daily Traffic
1,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.