PALM CANYON DRIVE over W CATHEDRAL CYN CHANNEL

0.9 MI. NW/O DATE PALM DR · County 065, California · Built 1963 · 7 Lanes · 33,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0506
Year Built
1963
Reconstructed
2010
Length
46.9 m (153.9 ft)
Max Span
11.6 m
Width
32.9 m (107.9 ft)
Lanes
7
Daily Traffic
33,000
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A