CATHEDRAL CANYON over WHITEWATER RIVER

0.6 M N/O ROUTE 111 · County 065, California · Built 2024 · 4 Lanes · 1,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
56C0663
Year Built
2024
Length
182.6 m (599.1 ft)
Max Span
40.5 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
1,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.