EL CIELO ROAD over TAHQUIZ CREEK
0.4 MI S RAMON ROAD · County 065, California · Built 2004 · 4 Lanes · 4,931 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.809383, -116.510497
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 22 years old.
Nearby Bridges
E PALM CANYON DR over PALM CANYON WASH
Built 1956
SUNRISE WAY over TAHQUITZ CREEK
Built 1985
SR 111 GENE AUTRY over PALM CANYON WASH
Built 1982
SUNRISE WAY over BARISTO FLOOD CONTROL CH
Built 1951
RAMON ROAD over BARISTO FLOOD CONTROL CH
Built 1960
GENE AUTRY TRAIL over HIGHWAY 111 CHANNEL
Built 1982
PALM HILLS DRIVE over HIGHWAY 111 CHANNEL
Built 1982
AVENIDA CABALLEROS over BARISTO FLOOD CONTROL CH
Built 1961
RAMON ROAD over WHITEWATER RIVER
Built 1982
CALLE EL SEGUNDO over BARISTO FLOOD CONTROL CH
Built 1966
Bridge Details
- Structure #
- 56C0537
- Year Built
- 2004
- Length
- 19 m (62.3 ft)
- Max Span
- 1.7 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 4
- Daily Traffic
- 4,931
- Material
- Steel
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.