ROUTE 74 over MORRILL CANYON

08-RIV-074-3.08 · County 065, California · Built 1931 · 2 Lanes · 11,730 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56 0169
Year Built
1931
Length
9.2 m (30.2 ft)
Max Span
9.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
11,730
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.