ROUTE 74 over LEACH CANYON CHANNEL
08-RIV-074-13.23-ESN · County 065, California · Built 1977 · 3 Lanes · 29,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
33.673375, -117.37665
This bridge is in worse condition than 68.1% of bridges in County 065. The average bridge in California is 0 years old; this one is 49 years old.
Nearby Bridges
MACHADO STREET over LEACH CANYON CHANNEL
Built 1991
TERRA COTTA STREET over MCVICKERCHANNEL
Built 1996
Route 74 over LAKE ELSINORE OUTLT CHNL
Built 1994
PASADENA STREET over FLOOD CONTROL CHANNEL
Built 1993
CHANEY STREET over ELSINORE CHANNEL
Built 1994
COLLIER AVENUE over WETLANDS
Built 1991
NICHOLS ROAD over TEMESCAL CREEK
Built 1980
COLLIER AVENUE over FLOOD CONTROL CHANNEL
Built 1993
NICHOLS ROAD over INTERSTATE 15
Built 1980
INTERSTATE 15 SB over STATE ROUTE 74
Built 1980
Bridge Details
- Structure #
- 56 0750
- Year Built
- 1977
- Reconstructed
- 1986
- Length
- 10.2 m (33.5 ft)
- Max Span
- 9.6 m
- Width
- 19.5 m (64 ft)
- Lanes
- 3
- Daily Traffic
- 29,500
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.