COLLIER AVENUE over FLOOD CONTROL CHANNEL
BY THIRD STREET · County 065, California · Built 1993 · 4 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.687819, -117.336514
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
PASADENA STREET over FLOOD CONTROL CHANNEL
Built 1993
INTERSTATE 15 SB over STATE ROUTE 74
Built 1980
INTERSTATE 15 NB over ROUTE 74 (CENTRAL AVE)
Built 1980
INTERSTATE 15 SB over WASSON CANYON WASH
Built 1982
INTERSTATE 15 NB over WASSON CANYON WASH
Built 1982
COLLIER AVENUE over WASSON DEBRIS BASIN
Built 1990
CHANEY STREET over ELSINORE CHANNEL
Built 1994
MINTHORN STREET over WASSON DEBRIS BASIN
Built 1990
DEXTER AVENUE over ARROYO DEL TORO CHANNEL
Built 2006
Route 74 over LAKE ELSINORE OUTLT CHNL
Built 1994
Bridge Details
- Structure #
- 56C0631
- Year Built
- 1993
- Length
- 9.3 m (30.5 ft)
- Max Span
- 4.5 m
- Width
- 24.1 m (79.1 ft)
- Lanes
- 4
- Daily Traffic
- 1,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.