COLLIER AVENUE over FLOOD CONTROL CHANNEL

BY THIRD STREET · County 065, California · Built 1993 · 4 Lanes · 1,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
56C0631
Year Built
1993
Length
9.3 m (30.5 ft)
Max Span
4.5 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
1,000
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.