INTERSTATE 15 SB over WASSON CANYON WASH

08-RIV-015-21.57 · County 065, California · Built 1982 · 3 Lanes · 61,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0739L
Year Built
1982
Length
34.1 m (111.9 ft)
Max Span
8.5 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
61,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.