Route 74 over LAKE ELSINORE OUTLT CHNL

08-RIV-074-R15.36-ESN · County 065, California · Built 1994 · 2 Lanes · 29,580 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
56 0784
Year Built
1994
Length
29.7 m (97.4 ft)
Max Span
11.6 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
29,580
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000
Total Project Cost
$663,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.