Route 74 over LAKE ELSINORE OUTLT CHNL
08-RIV-074-R15.36-ESN · County 065, California · Built 1994 · 2 Lanes · 29,580 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
33.691906, -117.349686
This bridge is in worse condition than 98.6% of bridges in County 065. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
DEXTER AVENUE over ARROYO DEL TORO CHANNEL
Built 2006
INTERSTATE 15 SB over STATE ROUTE 74
Built 1980
INTERSTATE 15 NB over ROUTE 74 (CENTRAL AVE)
Built 1980
PASADENA STREET over FLOOD CONTROL CHANNEL
Built 1993
COLLIER AVENUE over FLOOD CONTROL CHANNEL
Built 1993
COLLIER AVENUE over WETLANDS
Built 1991
CHANEY STREET over ELSINORE CHANNEL
Built 1994
NICHOLS ROAD over INTERSTATE 15
Built 1980
INTERSTATE 15 SB over WASSON CANYON WASH
Built 1982
INTERSTATE 15 NB over WASSON CANYON WASH
Built 1982
Bridge Details
- Structure #
- 56 0784
- Year Built
- 1994
- Length
- 29.7 m (97.4 ft)
- Max Span
- 11.6 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 29,580
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $395,000
- Total Project Cost
- $663,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.