STATE ROUTE 74 over HOT SPRINGS CANYON
12-ORA-074-12.34-SJCP · County 059, California · Built 1991 · 2 Lanes · 9,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.588986, -117.515517
This bridge is in worse condition than 69% of bridges in County 059. The average bridge in California is 0 years old; this one is 35 years old.
Nearby Bridges
STATE ROUTE 74 over SAN JUAN CANYON
Built 1929
STATE ROUTE 74 over SAN JUAN CREEK
Built 1987
STATE ROUTE 74 EB over HILLSIDE
Built 2010
STATE ROUTE 74 WB over HILLSIDE
Built 2010
STATE ROUTE 74 WB over HILLSIDE
Built 2008
CHIQUITA CYN DR over PATRONES PKWY
Built 2018
ROUTE 74 over MORRILL CANYON
Built 1931
SR 241 over Tijeras Creek
Built 1998
SR 241 over Tijeras Creek
Built 1998
ANTONIO PARKWAY over STATE ROUTE 241
Built 1998
Bridge Details
- Structure #
- 55 0063
- Year Built
- 1991
- Length
- 32 m (105 ft)
- Max Span
- 30.5 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 9,800
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.