STATE ROUTE 74 over SAN JUAN CANYON
12-ORA-074-13.29-SJCP · County 059, California · Built 1929 · 2 Lanes · 9,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.590372, -117.501575
This bridge is in worse condition than 69% of bridges in County 059. The average bridge in California is 0 years old; this one is 97 years old.
Nearby Bridges
STATE ROUTE 74 over HOT SPRINGS CANYON
Built 1991
STATE ROUTE 74 EB over HILLSIDE
Built 2010
STATE ROUTE 74 WB over HILLSIDE
Built 2010
STATE ROUTE 74 WB over HILLSIDE
Built 2008
STATE ROUTE 74 over SAN JUAN CREEK
Built 1987
ROUTE 74 over MORRILL CANYON
Built 1931
ROUTE 74 over DECKER CANYON
Built 1931
NO DATA ENTERED over NO DATA ENTERED
Built 2015
NO DATA ENTERED over TRABUCO CREEK
Built 2007
CHIQUITA CYN DR over PATRONES PKWY
Built 2018
Bridge Details
- Structure #
- 55 0064
- Year Built
- 1929
- Length
- 54.9 m (180.1 ft)
- Max Span
- 45.4 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 9,800
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.