2ND STREET over WARM CREEK

300 FT E/O ARROWHEAD AVE · County 071, California · Built 2022 · 2 Lanes · 8,055 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
54C0803
Year Built
2022
Length
17.1 m (56.1 ft)
Max Span
15.6 m
Width
25 m (82 ft)
Lanes
2
Daily Traffic
8,055
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.