MILLIKEN AVE over PHILADELPHIA ST

0.45 MI WEST OF I-15 N · County 071, California · Built 2016 · 8 Lanes · 18,780 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
54C0775
Year Built
2016
Length
13.6 m (44.6 ft)
Max Span
13.6 m
Width
39.2 m (128.6 ft)
Lanes
8
Daily Traffic
18,780
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.