STATE ROUTE 60 over MILLIKEN AVENUE

08-SBD-060-R9.94-ONT · County 071, California · Built 1972 · 14 Lanes · 200,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1070
Year Built
1972
Reconstructed
1997
Length
48 m (157.5 ft)
Max Span
24 m
Width
71.9 m (235.9 ft)
Lanes
14
Daily Traffic
200,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.