E60-N&S15 CONNECTR over MILLIKEN AV-E60 ON-RAMP

08-RIV-060-R0.15 · County 065, California · Built 1979 · 2 Lanes · 15,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56 0685G
Year Built
1979
Length
119.1 m (390.7 ft)
Max Span
30.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
15,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.