INTERSTATE 15 SB over MISSION BLVD & UP RR

08-RIV-015-51.95 · County 065, California · Built 1979 · 5 Lanes · 107,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0695L
Year Built
1979
Reconstructed
1987
Length
106.6 m (349.7 ft)
Max Span
32.7 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
107,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.