BASELINE STREET over INTERSTATE 215 / BNSF RR

08-SBD-215-8.08-SBD · County 071, California · Built 2011 · 4 Lanes · 20,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1223
Year Built
2011
Length
114.4 m (375.3 ft)
Max Span
43 m
Width
36.4 m (119.4 ft)
Lanes
4
Daily Traffic
20,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.