MASSACHUSETTS AVE over INTERSTATE 215 & BNSF RY

08-SBD-215-9.03-SBD · County 071, California · Built 2012 · 2 Lanes · 9,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
54 1265
Year Built
2012
Length
126 m (413.4 ft)
Max Span
30.4 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
9,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.