S259-S215 CONNECTR over INTERSTATE 215
08-SBD-259-L0.11-SBD · County 071, California · Built 2013 · 2 Lanes · 18,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.126731, -117.302906
This bridge is in worse condition than 59.4% of bridges in County 071. The average bridge in California is 0 years old; this one is 13 years old.
Nearby Bridges
N215-N259 CONNECTR over NB I-215 ON RAMP
Built 2013
16TH STREET over I-215 SR259 CONNS RAMPS
Built 2013
S215 OFF RAMP over BASELINE STREET
Built 2013
BASELINE STREET over INTERSTATE 215 / BNSF RR
Built 2011
S215 ON RAMP over BASELINE STREET
Built 2013
MASSACHUSETTS AVE over INTERSTATE 215 & BNSF RY
Built 2012
STATE ROUTE 259 SB over HIGHLAND AVENUE
Built 1968
STATE ROUTE 259 NB over HIGHLAND AVENUE
Built 1968
9TH STREET over INTERSTATE 215 & BNSF RR
Built 2011
HIGHLAND AVENUE over I-215 CAJON BL BNSF RY
Built 2011
Bridge Details
- Structure #
- 54 1239F
- Year Built
- 2013
- Length
- 287.3 m (942.6 ft)
- Max Span
- 70.7 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 18,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.