STATE HWY 71 SB over PEYTON DRIVE

08-SBD-071-R0.13-CHNH · County 071, California · Built 1996 · 4 Lanes · 50,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1103R
Year Built
1996
Length
66 m (216.5 ft)
Max Span
66 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
50,500
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.