E60-S71 CONN OC over PEYTON DR OFF-RAMP

07-LA-060-R29.45-POM · County 037, California · Built 1993 · 2 Lanes · 225,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2832G
Year Built
1993
Length
277.4 m (910.1 ft)
Max Span
48.8 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
225,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.